Copy
Building Inspection
3375 Edison Way
Menlo Park, 94025
YourName@YourSiteName.com
Elected Offices
Building Inspection
It is unlawful to erect, construct, reconstruct, alter, or change the use of any building or other structure within a municipality without approval of a building permit. (UCA 17-27a-802)

Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect, install gas, mechanical or plumbing system, the installation of which is regulated by this code, or to cause any such work to be done, shall first make application to the Building Official and obtain the required permit. (IRC 2009 R105.1)
71 South 200 West
PO Box 854
Delta, Utah

Phone: 435.864.1400
Fax:     435.864-1404
Cell:     435.979.1320


Derrell Owens
Building Official

Office Hours:
7:00 a.m. - 5:45 p.m.
Monday - Thursday




WHEN DO I NEED A PERMIT?
Remember: "CALL FIRST, THEN BUILD!"
The Building Inspection Department provides a variety of building services throughout the County to provide protection for the health, safety, and welfare of the general public in relation to the use and occupancy of structures by enforcement of adopted building codes and to protect the general public from abuse by unlicensed contractors by enforcement of state contractor licensing laws.
An approved inspection must be made every 180 days minimum (six months) or your permit will EXPIRE.
WHEN IS CONSTRUCTION EXEMPT FROM A PERMIT?    
Design criteria for
most of Millard County:
(This may not be accurate for all projects
and may require job specific engineering tests)
Roof live load: 30psf
Floor live load: 40psf
Deck live load: 60psf
Ground snow load: 43#
Wind load: 90mph (3 sec)/ 75mph
Frost Depth: 30”
Seismic Zone: “C”
Exposure: “C”
Millard County adheres to the following codes with State of Utah Amendments.
Building Codes Being Used: 

  • International Residential Code 2012
  • International Building Code 2012
  • International Plumbing Code 2012
  • International Mechanical Code 2012
  • National Electrical Code 2012
  • International Fuel/Gas Code (IFGC) 2012
  • International Energy Conservation Code 2012 Residential  & 2009 Commercial
  • Utah Wildland Urban Interface Code

Code books are available for purchase from most online book retailers and bookstores.  Codes can also be verified by contacting the Building Office.
--------------------------------------------------------------------------
There are copies of the Utah Wildland Urban Interface Code available. The cost is a $1 per book for the shipping and handling. To order your copy of the Utah Wildland Urban Interface Code, please contact Tyre Holfeltz:
Phone: 801-538-7487
Email: tyreholfeltz@utah.gov

Please include a name, mailing address and number of code book's needed.
NEW OFFICE HOURS
Effective September 6, 2011, office hours for the Millard County Offices in Delta are Monday thru Friday
8:00 a.m. to 5:00 p.m.